Responder

Maintenance and maintenance of crushing equipment

Autor
Guest
Super Member
  • Posts Totales : 1718
  • Puntos Premio: 0
  • Inscrito: 2008/07/24 00:00:00
  • Estatus: online
2019/05/23 01:20:44 (permalink)

Maintenance and maintenance of crushing equipment

The old and new alternations are the unchanging truths of the past, so people are, and so are machines. Mining machinery are no exception. The time from the start of the work to the end of the life of the crusher is the time when the crusher reflects the value. Any machine can extend the use value. The extension method is maintenance. It should be maintained before, during or after the operation. The cost and use value of the bottom crusher, the following is the way the crusher is maintained: Transfer maintenance: Before the crusher is transferred to the construction site, it should be transferred and maintained. The contents of the work can be maintained according to the technical condition of the crusher, and the anti-corrosion can be carried out when necessary. The transfer maintenance is carried out by the unit of the crusher and moved out of the organization, and the project department, asset manager checks, and the asset management department supervises. Seasonal maintenance: The main content is to replace the lubricants and fuels in the applicable season, take anti-freeze measures, and increase anti-freezing facilities. Organized by the use department, the operation monitor checks and supervises. Maintenance during the run-in period: After the completion of the new machine and overhaul , the maintenance period must be carried out. The main contents are cleaning, tightening, adjusting and replacing the lubricant. The use department completes the asset manager inspection and asset management. Department supervision. Some people think that this kind of unskilled crusher needs such fine maintenance, which is really troublesome. This is the case, good maintenance can make your machine listen to you more.

0 Respuestas Related Threads

    Guest
    Respuesta Rápida: (Abrir versión completa)
      Enter the random characters shown
    Enviar
    Some restrictions apply to prevent link (URL) Spam.
    All links inserted into messages, signatures, and PM's are removed unless you have ...
    • been a member for at least 5 day(s);
    • made a total of 5 post(s);
    • earned at least 0 point(s) for post scores (based on the ratings on your posts);
    • earned at least 0 reward point(s);
    Ir a:
    © 2019 APG vNext Trial Version 5.5